BROKERS · PROPERTY MANAGERS · FINANCING ADVISERS (SWITZERLAND — 26 CANTONS)

Stop Losing Signed Buyers to 4-Week Energy & CAPEX Underwriting Delays

The credit committee is waiting on a works number. The file that comes back is four A4 pages, drawn from the federal and cantonal registers, inside one working day.

01

Pre-2000 stock is where the file stalls.

The bank wants a works figure before it will hold the rate. A contractor's visit or a full audit still sits on a four-week diary. The buyer who already signed does not.

02

The same public registers, read the same way each time.

  1. 01

    RegBL (FSO) and geo.admin

    Street or EGID, year or period, footprint, storeys, dwellings, heat generator.

  2. 02

    Solar roof (SFOE / Sonnendach)

    Usable area, irradiation class and the yield that office already publishes.

  3. 03

    RDPPF / ÖREB cadastre

    Zone, noise, and only the constraints the cantonal portal actually returns.

  4. 04

    Deterministic CAPEX matrix (±15%)

    Envelope, heating transition, roof and solar, windows. Low, median, high.

03

Four pages. Then it stops.

  1. 01

    Executive and pre-mortgage summary

    Register identity, how complete the official sources are, net CAPEX to finance.

  2. 02

    Heat, solar roof, envelope

    Generator life, Sonnendach yield, roof, windows and facade when the period calls for them.

  3. 03

    Parametric CHF ranges, excl. tax

    Works, indicative Buildings Programme lines, theoretical monthly charge.

  4. 04

    RDPPF constraints, OGD trace and scope

    Public-law extract, the source line, and the ±15% shield: not a CECB®, not SIA 118.

04

The number on the invoice is the number on this page.

CAPEX Pass · Single

CHF 390 excl. tax

The PDF within 24 hours, and a Swiss QR-invoice.

Agency pack · 5 files

CHF 1,650 excl. tax

CHF 330 excl. tax each, usable for 12 months.

From 25 files, or under a white-label line, the desk writes the terms. If you were given a pilot or agency code, put it in the form. PILOTE-1 is the current trial code. Nothing on this page takes a card.

05

The building, the desk, the send.

Order